Skip to main content

Spitalul Municipal „Dr. Aurel Tulbure”

Făgăraș

Clean environment for air conditioning & advanced air purification installations

Detalii lucrare

Project execution: 02.11.2018 – 21.12.2018

Clean environment for air conditioning & advanced air purification installations

Implemented solution:

Fitting out and partitioning (design and execution) clean rooms (partitioning, wall cladding, joinery and finishing elements, doors, glazing).

HVAC installations for air conditioning and advanced air purification.

Electrical installations weak frames.

Medical gas installations.

Products / Partners:

IMGRAD, Slovenia – Clean room compartments including pass-box.
ARMSTRONG, USA – „CLIP IN” type metal cassette ceiling for clean rooms.
GERFLOR Flooring Group, EU – Professional antimicrobial PVC flooring for medical rooms.
RUCK VENTILATOREN GmbH, Germany – Air handling unit with energy recovery.
SAMSUNG, South Korea – DVM-S Inverter condensing unit.
FRANCE AIR, France – Air filtration and distribution equipment and elements.
AGA LIGHT – LUXIONA, Poland – „CLIP IN” type environmental and emergency lighting for clean rooms.
LEGRAND, USA – Antimicrobial electrical equipment and fixtures.

X-Lab Solutions innovation:

Establishment and implementation of architectural and technological solution principles for medical functional compartments together with HVAC installation for air conditioning and advanced air purification, for cleanliness class ISO 5 according to ISO 14 644 1/2015 equivalent RISC MA XIM 4 – Conf. NFS 90 351.

Electrical installations for weak currents.

Validations – tests, measurements and certifications specific to cleanrooms according to ISO 14 644 „Cleanrooms and associated controlled environments”.